BTV30.1CA-32R-50B-D-020200-FW product details
The BTV30.1CA-32R-50B-D-020200-FW is a recorded designation in the Indramat BTV family. Match every character and the installed configuration before ordering or substituting.
Control sections and operator panels can differ in hardware generation, communication and I/O options, safety hardware, firmware, storage and machine application. Verify the complete label and installed options.
Historical inventory reference
| Exact designation | BTV30.1CA-32R-50B-D-020200-FW |
|---|
| Family | BTV |
|---|
| Model group | BTV30 |
|---|
| Product type | BTV Operator Terminals |
|---|
| Quantity | No current quantity is published for this catalog record. Request a current stock check. |
|---|
| Current price & condition | Confirmed with your quote |
|---|
The quantity snapshot, photo reference and photo review can have different dates. None confirms today’s physical stock, test status, firmware or included accessories.
Family-level technical source
BTV reference context
Factory documentation for BTV20 hardware, keyboard and front panel, interfaces, configurations and replacement planning.
This source documents part of the broader product family. Its listed hardware generation may differ from this unit. It does not establish the ratings, options or compatibility of this exact designation. Match the complete physical label, design generation and document edition before using any technical values.
Open family reference: BTV20.3 - Project Planning Manual →How to choose the applicable manual →
Photos help confirm the match
Start with the complete control or panel label and full unit. Add communication and I/O connectors, option-card labels and slot positions, storage and software labels where accessible. Record the machine application and available backup details; avoid sharing passwords or other access credentials.
Full nameplate and photo checklist →Repair and testing
Send the machine builder, model, axis, fault history and photos of the label and installed interfaces. Litco reviews the unit before confirming repairability, testing, timing and terms.